Located at Panattoni Park Stryków, the investment for the Leroy Merlin chain is one of the biggest contracts in the warehousing market.
The BTS Leroy Merlin facility, with its strategic location, serves as a nationwide logistics centre. The facility boasts 63 docks and 6 drive-in gates, with ground level entry and non-standard dimensions of drive-in gates [4 rn x 4.5 m]. These solutions were introduced to enable the tenant to store oversized goods. Moreover, to meet the tenants' needs, a 6,000 sqm outdoor roofed enclosure was built on the premises to store goods which do not need to be kept indoors, and space was made for press containers.