BTS Castorama Stryków

BTS Castorama Stryków

The developer built a 100,000-square-metre distribution centre for the DIY/home improvement market leader. Warehouse space accounts for as much as 98.5 per cent of the entire space, while office and staff facilities takes up 1,450 sqm and is adapted for the planned headcount of 300 employees. The investment has been delivered in Stryków and was proceeded in two stages. The project was defined with the concepts of sustainable development in mind, e.g. in order to reduce energy consumption it will feature innovative LED lighting with motion sensors.

Total de superficie
100 000
Superficie de almacenes
98 550
Superficie de oficinas
1 450

Disponibilidad a nivel regional

Ubicación
BTS Castorama Stryków


The distribution centre was built in Stryków – one of the top locations on Poland’s warehousing map. The proximity of Łódź, as well as major transportation routes – a motorway junction on the A2 (Stryków II), and the road no 71 (Zgierz-Stryków) near the national road no 14 (Warsaw-Łódź) – all mean that the new warehouse enjoys excellent connections with the rest of the country. At the same time, with Łódź less than twenty kilometres way, the facility is  able to make the most of the abundant local labour pool. Its location in the very centre of Poland, at the intersection of the most important transport routes, is perfectly suited to the needs of the company, which operates in a number of regions across the country and requires access to fast international road connections, too.

Datos de contacto