BTS H&M

BTS H&M

The BTS facility for the fashion chain H&M was the first project in the developer's portfolio to feature environment- friendly solutions on a wide scale.

Solar panels are installed on the roof, and used to heat water; the modern structure used in the warehouse hall lets in daylight, Which makes for daytime energy savings. The building is equipped with a rainwater harvesting system, and materials such as PVC or polystyrene foam were not used in the construction.

Totale oppervlakte
83 200
Magazijn oppervlakte
72 800
Bureau oppervlakte
10 400

Beschikbaarheid op regionaal niveau

Lokalisatie
BTS H&M
Magazynowa 3, 62-023 Gądki
Poznań

The project lies 13 kilometres from Poznań, nearthe A2 motorway.

 